McElroy Metal's Marshall, MI facility is the latest McElroy factory to generate solar power. The 145kW photovoltaic system will harness 168,926 kWh annually, reducing Marshall's energy usage by 62 percent. In addition, the system will reduce 127 tons of carbon dioxide each year, which is the same effect as planting 2,946 trees annually for the life of the system.
McElroy Metal has also installed solar on facilities at Peachtree City, GA; Clinton, IL; Adelanto, CA and Sunnyvale, TX.